welcome,guest
Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-12-26 12:55
195
Company Profile
Shandong Wuzheng Group Co. Ltd (three-wheel vehicle)By certification [File Integrity]
Contact: tengtian(Ms.)
Telephone:
Area: Beijing
Address: Beijing
Website: http://tengtian.szqq888.com/
unit price:Negotiable
unit price:Negotiable
unit price:Negotiable
unit price:Negotiable
unit price:Negotiable
unit price:Negotiable
Part I | Applications | cargo transport |
Technical Design | Design max speed | ≥60 km/h |
Loading capacity | 500 kg | |
Unladen kerb weight | 450 kg | |
Dimensions (L*W*H) | 3455x1300x2030 mm | |
Cargo size(L*W*H) | 1.8*1.25*1.3m | |
Colors | red/green/yellow/black/other colors | |
Track | 1050 mm | |
Wheel base | 2300 mm | |
Brake mode | front and back wheels, drum | |
Transmission type | shaft drive | |
Power | 11.5kw | |
Cool type | water cooled | |
Min fuel Consumption | <=354g kW.H | |
Fuel type | gasoline | |
Fuel tank capacity | 12 L | |
Part II | Engine type | single cylinder,4-stroke,camshaft downward, Lifan, 200cc |
Engine Details | Bore stroke | 62x49.5mm |
Fuel type | gasoline | |
Compression ratio | 9.5:1 | |
Rated power and rotating speed | 13 kw /8000rpm | |
Max torgue/rotating speed | 15 N.m /6500rpm | |
Lowest no-load speed stability | 1500±150rpm | |
Ignition system | C.D.I. | |
Apply to | motor tricycle | |
Starter | kick/electric | |
Part III | Tire | 5.00-12(with spare tire) |
Operation | Transmission mode | shaft drive |
Transmission | 5 forward and 1 reserve gears | |
Front suspension | single spring | |
Rear axle | suspension reinfored | |
Rear suspension | 5+4 leaf spring | |
Gearshift Control | manual-foot | |
Clutch method | manual-hand | |
Brake operate mode | manual-hand or foot | |
Part IV | Transport | by land/sea/other |
Packing | Port of loading | Chongqing/Shanghai/Other ports of china |
Manufacturer | Chongqing Tengtian Group | |
Package | SKD | |
Loading capacity (SKD) | 16 sets in 20GP; 40 SETS in 40HQ | |
Delivery time (from loading port) | 20-25 days after receiving advance payment |